Jialian interface upgrade tutorial

Our company has issued Document No. 259 to all cooperative institutions on September 15, 2022, regarding the technical specifications for terminal reporting and transaction submission. Please refer to the specifications and guidelines to complete the system transformation as soon as possible to support the submission of terminal number information, IP address or latitude and longitude information in the message. External code payment No. 259 transformation technical specification guide document: https://jlpay.yuque.com/docs/share/8f18b673-b203-48c8-932e-021fc64dd6f4?#

  1. For terminals that have not completed the transformation within the time limit, our company will take necessary measures such as suspending the provision of transfer payment services in accordance with regulatory requirements, and the consequences arising therefrom shall be borne by your company.

The program has been updated. Please follow the steps below to upgrade the interface. After the interface is successfully upgraded, please make a transaction test.

image-20230504143918671

Copyright © zl771.cn 2021 all right reserved,powered by Gitbook该文件修订时间: 2025-08-13 22:31:38

results matching ""

    No results matching ""